Mathematics : asked on juju1085
 20.11.2021

a company found that an experienced surveyor can survey a roadbed in 5 hours. an apprentice surveyor needs 8 hours go survey the same stretch of road. if the two work together, find long it takes them to complete the job

. 4

Faq

Mathematics
Step-by-step answer
P Answered by PhD

The solution is in the following image

The solution is in the following image
Mathematics
Step-by-step answer
P Answered by PhD
The answer is in the image 

The answer is in the image 

Mathematics
Step-by-step answer
P Answered by PhD

The answer is in the image 

The answer is in the image 
Mathematics
Step-by-step answer
P Answered by PhD

Salesperson will make 6% of 1800

=(6/100)*1800

=108

Salesperson will make $108 in $1800 sales

Mathematics
Step-by-step answer
P Answered by PhD

The wood before starting =12 feet

Left wood=6 feet

Wood used till now=12-6=6 feet

Picture frame built till now= 6/(3/4)

=8 pieces

Therefore, till now 8 pieces have been made.

Mathematics
Step-by-step answer
P Answered by PhD

The wood before starting =12 feet

Left wood=6 feet

Wood used till now=12-6=6 feet

Picture frame built till now= 6/(3/4)

=8 pieces

Therefore, till now 8 pieces have been made.

Mathematics
Step-by-step answer
P Answered by PhD

The answer is in the image 

The answer is in the image 
Mathematics
Step-by-step answer
P Answered by PhD

Area of rectangle= L*b

here,

L=12.4 cm

b= 8.8 cm

A= L*b

= 12.4 * 8.8 = 109.12 cm^2

Mathematics
Step-by-step answer
P Answered by PhD

Given height of gymnasium is 5/6 height of 30 foot ball

therefore height of gymnasium=5/6 * 30

=25 feet

Mathematics
Step-by-step answer
P Answered by PhD

Cost of 6 gallons =$15

Cost of 1 gallon =15/6

                           =$2.5

Cost of 7 gallons=$2.5 * 7

                           =$17.5

Try asking the Studen AI a question.

It will provide an instant answer!

FREE