a. 31.304. b. 1525. c. 1589.17
Explanation:
Lead time = 5 weeks
Standard deviation of weekly demand = 14 pints
a. ✓L × Standard deviation Weekly
= ✓5 × 14
= 2.236 × 14
= 31.304
b. Average demand during the 5-week lead time will be:
= Leadtime × weekly demand
= 5 × 305
= 1525
c. Note that the Z value at 96% service level is 2.05
R=dL+z*sd*sqrt(L)= (305 × 5)+ (2.05 × 14 × ✓5)
= 1525 + 64.17
= 1589.17
SI=(P*R*T)/100
P=2000
R=1.5
T=6
SI=(2000*1.5*6)/100
=(2000*9)/100
=180
Neil will earn interest of 180
The answer is in the image
F=ma
where F=force
m=mass
a=acceleration
Here,
F=4300
a=3.3m/s2
m=F/a
=4300/3.3
=1303.03kg
Speed=Distance/time
distance=15m
time=1sec
speed=15/1=15m/sec
Distance=Speed*time
time=15min=15*60sec=900sec
Distance travelled in 15 min=15*900=13,500m
=13500/1000 km=13.5Km
The wood before starting =12 feet
Left wood=6 feet
Wood used till now=12-6=6 feet
Picture frame built till now= 6/(3/4)
=8 pieces
Therefore, till now 8 pieces have been made.
Salesperson will make 6% of 1800
=(6/100)*1800
=108
Salesperson will make $108 in $1800 sales
It will provide an instant answer!